Beverly7520 Beverly7520
  • 01-03-2018
  • Social Studies
contestada

In the lean principles philosophy, unexpected downtime is the result of unreliable processes.

a. True

b. False

Respuesta :

Grace0424
Grace0424 Grace0424
  • 01-03-2018
I thinks the answer is true
Answer Link

Otras preguntas

What is the hydroxide ion concentration of a solution with a ph of 8. 25?
graph 3/6 3/4 and 3/12 on a number line
Jose wakes up early if and only if he is going for a bike ride. Which choice is the contrapositive of the statement? OA Jose doesn't wake up early if and only i
You require a clear idea of why you are seeking a particular goal before you can establish your values true or false
Find the area of the blue shape below. Use 3.14 for π If anyone knows the answer please help!
A translocation between chromosomes 8 and 14 results in an enhancer element in direct control on the c myc gene if the enhancer element leads to over expression
Increasing opportunity costs of producing goods imply that the production possibilities curve will be?
What characteristic of the epa makes it more difficult for the agency to combat climate change?
Some parts of the sentences have errors and some have none. Find out which part of a sentence has an error. A) Her black long/ B) hair adds/ C) glamour to her l
if x = 1/r + 1 then solve the equation xr + 2/3 = 2r (show your work)