liluv4590 liluv4590
  • 02-04-2019
  • Mathematics
contestada

A potter works 4 days a week, makes 14 pots per day on average, and charges $24 a pot. Money per 4-day workweek?

Respuesta :

greubel80
greubel80 greubel80
  • 02-04-2019
Step by Step:

14 average pots x 4 days a week = average money made

14x4= 56

56 pots a 4-day week x 24$ a pot

56x24 = 1344$
Answer Link

Otras preguntas

Can someone explain lesson 6.3 math boxes in everyday math regarding the missing numbers on the number lines
A test cross with an organism with a homozygous recessive genotype results in 50% of the offspring exhibiting the recessive trait. What is the genotype of the t
How can i solve this f:d->R f(x)=x at power2/x-1
If a circle is cut from a square piece of plywood, how much plywood would be left over? Use 3.14 for pi
Estimate the angle of elevation from the trailhead to the summit.
Estimate the angle of elevation from the trailhead to the summit.
Meg pounded a stake into the ground. When she attached a leash to both the stake and her dog’s collar, the dog could reach 9 feet from the stake in any directio
How do you say little sister, little brother, older sister, and older brother in Korean? I hope someone who actually know Korean can answer this question.
If y^8= 4 and y^7=3/x, what is the value of y in terms of x?
A midwestern music competition awarded 35 ribbons. The number of blue ribbons awarded was 3 less than the number of white ribbons. the number of red ribbons was